Our 2nd washery came up at Ramagundum (near Hyderabad) in 2004 with a capacity of 1.0 MTPA. In Nov-2009 the Washery has been modified to exclusively cater Singareni Collieries Company Limited (SCCL). The contract with SCCL assures minimum 4 years (extendible on mutual consent) of operations with minimum assured quantity 0.50 MTPA of raw coal. This worksite uses Barrel Washer Technology for coal beneficiation.