Mine Development & Operations

SPHERE OF ACTIVITIES

MINE DEVELOPMENT & OPERATION

The mine development activities generally involves following operations :-

    Mine Planning, Mine Designing and Mine Scheduling
    Prospecting and Boring
    Preparation of Mine Plan and obtaining approval from MOC
    Preparation of Environment Management Plan
    Preparation of Mine Closure Plan
    Assisting in obtaining clearances from statutory authorities
    Feasibility Studies
    Socio-Economic Survey
    Land acquisition including diversion of forest land (if tendered s.t funding by owner)
    Approach Road – construction & maintenance
    OB Removal and Mining of coal
    Logistics (Coal)
    Coal Handling Plant
    Coal Washery
    Green Belt Development
    Depressurisation of ground aquifer
    Workshop & Store
    All other auxiliary works

JOINT VENTURE

MDO PROJECTS

Pakri Barwadih Coal Mining Project

NTPC Limited has awarded the development and operation of Pakri Barwadih coal block to Thriveni Sainik Mining Pvt. Ltd., (a joint venture between Sainik Mining And Allied Services Limited (SMASL) & Thriveni Earthmovers Pvt. Ltd. (TEMPL) for a period of 27 years. The annual production target is 15 MTPA. SMASL holds 49% and TEMPL holds 51% equity shares in the JV Company.

Rowghat Iron Ore Mining Project

SAIL Limited has awarded the development and operation of Rowghat Iron Ore block to ACB Mining Private Limited (a joint venture between Sainik Mining And Allied Services Limited (SMASL) and ACB (India) Limited (ACBIL) for a period of 30 years. The annual production target is 14 MTPA. SMASL holds 49% and ACBIL holds 51% equity shares in the JV Company.

STANDALONE

MDO PROJECTS

Dulanga Coal Mining Project

NTPC Limited has awarded the development and operation of Dulanga coal block to Sainik Mining And Allied Services Limited for a period of 24 years. The annual production target is 7 MTPA.